Friday 9 February 2018

Court orders Wrexham biomass plant builder to pay £10m

A bust up over lack of progress with construction of a £25m Wrexham biomass plant in North Wales has seen the High Court order the contractor to repay nearly £10m.

Liverpool-based Green Plan Energy, with backing from funder Equintix and the Green Energy Bank, appointed Bester Generaciόn UK , part of the global Bester Group, to build the project in May 2016.

The project was designed to generate 34 GWh of green energy a year, enough to power 2,400 homes. As a combined heat and power plant it will also have the potential to provide heat to nearby manufacturing businesses.

But works never progress much beyond the enabling phase and by July 2017 the developer terminated the epc contract. Two weeks later Bester Generaciόn UK told the client it would no longer proceed with the job.

A previous adjudication found that the contractor had not been entitle to an extension of time and was to blame for the delays. And a later adjudication ordered that the contractor repay £9.8m with a further sum of £4,948.45 per day of interest.

This was challenged by the contractor but has been upheld in the High Court.

In his determination Justice Coulson said: “Unhappily, although this project has apparently cost a good deal of money, very little was ever achieved.

“It is common ground that the defendant’s works never moved beyond the preparatory stages. The claimant’s solicitor, noted in his second statement, “excavation on site had not yet taken place at the point of termination. No plant, machinery or steelwork has ever been assembled, installed or erected on site. The evidence of the claimant’s project manager, does not dispute that.”

About 80% of the £10m odd awarded by the adjudicator in the second adjudication was made up of the first four Payment Milestones which the claimant had originally paid to the defendant.

In judgement Justice Coulson said: “I order that the defendant is obliged to pay only £4.5m now, and to bring a further £1m into court. There will be a stay of execution in respect of the remaining sum – around £4.5m – until further order.”



from Construction Enquirer http://www.constructionenquirer.com/2018/02/09/court-orders-wrexham-biomass-plant-builder-to-pay-10m/

via Tumblr http://ndbasilica.tumblr.com/post/170677299789

No comments:

Post a Comment