Thursday, 7 March 2019

Mick George boosts stabilisation business with new kit

Mick George has signalled it intent to grow its stabilisation division with a £500,000+ investment in a new piece of kit.

The Wirtgen 250i ‘S Pack’ has been thrust straight in to action at the National Trust’s Wimpole Estate in Cambridgeshire where Mick George Ltd is carrying out enabling works.

The new machine adds to an already extensive fleet of equipment at the stabilisation division.

The ‘S Pack’ has the advanced capability to spread binding agent without generating clouds of dusts, thus lowering emission levels, permitting Mick George Ltd to tackle those environments where strict emission standards exist.

Michael George, Managing Director of Mick George Ltd said: ‘’To maintain the exceptionally high standards that we set, we recognise the importance in continuously investing right across the business; in personnel, sites, vehicles and equipment.’

“The construction industry is ever evolving, with Stabilisation and Remediation solutions more frequently utilised in many developments.

“The new machine allows us to extend our offering and ensure we’re providing the same high quality that we do with all our Earthworks provisions.’’



from Construction Enquirer http://www.constructionenquirer.com/2019/03/07/mick-george-boosts-stabilisation-business-with-new-kit/

via Tumblr http://ndbasilica.tumblr.com/post/183292418949

No comments:

Post a Comment