Developer jailed after building collapse chaos

A Manchester-based property developer has been jailed for eight months after the roof and part of the rear wall collapsed at one of his buildings during demolition works.

Manchester Crown Court heard how Riaz Ahmad appointed a group of workers, who had no experience in construction, to carry out demolition work at a property in Oldham.

On 11 August 2017, after receiving a call from Oldham Metropolitan Borough Council’s building control department, a HSE inspector visited the site and found almost all the internal walls and supports of the roof had been taken out.

A Prohibition Notice was served preventing any further work and a major road running past the building was closed.

A day later, it was agreed that there was no safe way of accessing the building and Oldham MBC obtained an order to demolish the building.

It was soon after this that the roof and wall collapsed.

This triggered an emergency response involving Greater Manchester Police and the Fire Service, during which properties were evacuated and the area cordoned off.

Oldham Borough Council arranged for an emergency demolition of the remainder of building to take place later that day. Local businesses faced significant disruption as the site was made safe.

An HSE investigation found the collapse could have been prevented had a principal contractor been appointed and a suitable risk assessment been carried out.

These steps could have ensured the stability of the building during the demolition with regards to temporary works and control measures such as scaffolding.

Ahmad did not suitably plan the work as he employed unskilled workers, neglected the risks from working at height and stability of the building, failed to provide them with basic welfare facilities and did not consider several health hazards.

Riaz Ahmad, of Dickenson Road, Manchester, was found guilty of breaching safety regulations and was sentenced to eight months imprisonment for each offence (to run concurrently) and was order to pay prosecution costs of £65,000.

In his sentencing of Ahmad, the Judge remarked that: ‘This was a very serious case indeed.

“It was nothing short of a miracle that only one person was injured.

“A clear statement has to be made to those who undertake significant projects such as this, namely that health and safety legislation has to be adhered to for good reason, and those who ignore its basic tenets will receive punishment.

Speaking after the hearing, HSE inspector David Argument said: “The incident could so easily have been avoided by simply carrying out correct control measures and safe working practices.

“Duty holders should be aware that HSE will not hesitate to take appropriate enforcement action against those that fall below the required standards”.